The renovation of the Hospital Rotenburg will continue in summer 2017. From July 2017, the floors two to six of the B-wing are to be equipped with new patient rooms with wet cell and with new technology. The B-wing is the rear part of the building from the main entrance. After the renovation, there will only be one and two-bed rooms – with the possibility of setting up a third bed. Hornstein emphasized that the number of beds will not be reduced overall. After the decision…Continue Reading “NEWS: Hospital Rotenburg (Hesse) builds single and double rooms 2017”